Top-down view of the finished ADU slab still in its forms, anchor bolts set and the stepped bump-out at one corner — Berkeley Backyard Detached ADU, Berkeley, CA
Back to portfolio
Foundations

Berkeley Backyard Detached ADU

Berkeley, CA

Project Type
ADU Foundation
Project Year
2026
Structure
Detached backyard ADU
Finish
Steel-troweled slab
Overview

New Edge Concrete built the foundation for this detached backyard ADU in Berkeley in 2026, working with general contractor GR Innovative Builders. It is a classic Berkeley infill lot — neighbors on three sides and the only way in is down the side of the existing house — so the footprint was excavated and the spoils moved out through that narrow side yard before any concrete work began. We set the perimeter forms, laid a compacted base and vapor barrier under a full two-way rebar mat, and worked the underslab plumbing and electrical stub-ups in with the GC ahead of the pour. The slab went in by pump in a single day and was steel-troweled flat, with a thickened perimeter, anchor bolts set wet, and a stepped bump-out and short stem wall at the back corner for the ADU’s utility wall.

General ContractorGR Innovative Builders

Scope of work

  • Tight-access backyard excavation
  • Compacted base & vapor barrier
  • Full two-way rebar mat
  • Underslab plumbing & electrical coordination
  • Formed slab with thickened perimeter
  • Pumped pour & steel-trowel finish

The finished result

During the build

Excavation, forming, reinforcement, and the pour — the work behind the finish.