Long perspective completed sidewalk, curb + gutter — Durant Sidewalk — UC Berkeley, Berkeley, CA
Back to portfolio
Sidewalks & Flatwork

Durant Sidewalk — UC Berkeley

Berkeley, CA

Overview

A public sidewalk replacement on Durant Avenue at UC Berkeley — durable flatwork engineered for heavy daily foot traffic.

Scope of work

  • Public sidewalk replacement
  • Curb & gutter
  • ADA curb cuts
  • Channel drainage

The finished result

Long perspective completed sidewalk, curb + gutter — Durant Sidewalk — UC Berkeley, Berkeley, CAWide ground-level sidewalk + curb cut at corner — Durant Sidewalk — UC Berkeley, Berkeley, CAAerial drone of building + new sidewalk perimeter — Durant Sidewalk — UC Berkeley, Berkeley, CAFresh public sidewalk along multi-unit building — Durant Sidewalk — UC Berkeley, Berkeley, CABuilding entry arch + new sidewalk panels — Durant Sidewalk — UC Berkeley, Berkeley, CASidewalk opposite view — Durant Sidewalk — UC Berkeley, Berkeley, CAOverhead sidewalk + driveway apron w/ channel drain — Durant Sidewalk — UC Berkeley, Berkeley, CAFrontal building view, new sidewalk + curb at corner — Durant Sidewalk — UC Berkeley, Berkeley, CADrone top-down facade + sidewalk strip — Durant Sidewalk — UC Berkeley, Berkeley, CA